Trades and studios
Plumber invoice by text message
Text the labour, the parts and the call-out before you leave the house. The customer can open the lines while the repair is still in front of them.
A plumbing bill that fits in a text
Plumbing arguments are usually about a part the customer did not see or a call-out they forgot you mentioned. Put those on separate lines and text the link while you are still in the kitchen. If they ask why the valve is 48, you can point at the old one. That conversation does not survive until Thursday.
Split labour, parts and the call-out
Three lines beat one round number. The call-out is not labour, and the valve is not labour.
Name the address in the text
If you cover more than one property for a landlord, the street stops the “which job?” reply.
Use the terms you quoted
Net 14 if that is what you said. Due on receipt if they agreed to pay before you left.
Send it from the number on your van
A new number plus a link looks like a scam, especially when the amount is a few hundred.
What to put on this invoice
- Hours on site, with the rate
- Each part, with its price
- The call-out, if you charge one
- The address in the text when you work for landlords
Questions about this job
Should the text include the warranty?
One line is enough: “Valve guaranteed 12 months.” Put the detail on the invoice if it is longer than that.
What if I have to come back?
Invoice the first visit now. The return visit is a new line or a new invoice, not a silent edit.
Can I text a landlord and a tenant?
Send the invoice to the person who is paying. You can tell the tenant the job is finished without sending them the total.
The full plumbing layout, with the same kind of lines, is on the plumber template if you want to start there next time.
Related guides
Electrician SMS invoice template
An electrician’s SMS should show labour, materials and the call-out as separate numbers, with one link to the full invoice.
Open guide →Landscaper text invoice
Text the garden labour, the materials and the delivery separately. A single “garden work” total is what starts the dispute about the mulch.
Open guide →HVAC technician invoice by text
Text the diagnostic, the labour and the part as three lines. An HVAC bill that says only “service” is the one that gets challenged.
Open guide →